⚡ Emergency roof repairs available 24/7 — Call now: 01483 346 855
Services Areas Reviews FAQ Blog Glossary Free Quote
For managing agents & freeholders

Block Management Roofing

Communal roof repairs, Section 20 consultation support, reserve-fund condition surveys and resident communication — for managing agents, freeholders, RTM companies and residents' associations across Godalming.

Block management roofing in Godalming: we support Section 20 LTA 1985 consultations for major works over £250 per leaseholder, provide specification documents and itemised estimates for the consultation process, and deliver communal roof repairs with resident communication. Call 01483 346 855.
NFRC Registered
Fully Insured
10 Year Guarantee

Roofing for Managed Blocks in Godalming

Section 20 Consultation — How We Support the Process

Under Section 20 of the Landlord and Tenant Act 1985, any qualifying works costing more than £250 per leaseholder require a formal consultation process. This includes most communal roof repairs and replacements. The process has three stages: notice of intention, obtaining and presenting estimates, and notification of the awarded contract.

We support managing agents and freeholders at the estimates stage by providing: a detailed written specification of the proposed works, a fully itemised estimate broken down by work element (not a lump sum), and a clear scope statement that the estimates stage consultation document can reference. Our specifications are detailed enough to allow meaningful comparison with other contractors' estimates — which is what the consultation process requires.

Communal Roof Expertise

Blocks of flats present roofing challenges that individual houses do not. Flat roofs over communal stairwells, pitched roofs covering multiple units, shared valley gutters between sections, and access coordination across multiple leaseholders all require experienced management. We have worked on managed blocks across Godalming and understand the communication, scheduling and documentation requirements that managing agents need.

Reserve Fund Planning

We provide roof condition surveys with 5-year and 10-year cost forecasts that support reserve fund planning. These surveys give managing agents and directors an evidence-based budget for anticipated major works, avoiding the emergency levy situations that damage leaseholder relationships and block management reputations.

Scaffold and Resident Communication

Scaffold on managed blocks requires resident notification, sometimes council scaffold licences for pavement occupation, and coordination with ground-floor commercial tenants where applicable. We handle scaffold logistics and provide resident notification templates that managing agents can issue. Scaffold duration and location are confirmed in writing before erection.

Named Local Blocks and Areas

Godalming's converted Victorian and Edwardian properties in the town centre and Farncombe include several managed blocks with communal roofing needs. Purpose-built flat developments along Woolsack Way and in the newer Ockford Park area also fall within our coverage. We are familiar with the specific roof types, access constraints and management structures across the Godalming area.

Source: Landlord and Tenant Act 1985, Section 20 — qualifying works exceeding £250 per leaseholder require formal consultation. The Property Institute (TPI) guidance recommends obtaining at least two detailed, comparable specifications to ensure the consultation process is meaningful and defensible.

Section 20 — Step by Step

The Section 20 consultation process has three mandatory stages for qualifying works (those costing more than £250 per contributing leaseholder):

Stage 1 — Notice of Intention: The landlord or managing agent serves notice describing the proposed works and inviting observations. Leaseholders have 30 days to respond. We provide the technical specification that forms the basis of this notice — describing the roof condition, the proposed remedy, and the materials and methods to be used.

Stage 2 — Estimates: At least two estimates must be obtained (or, if any leaseholder nominates a contractor, that contractor must also be invited to quote). We provide a fully itemised estimate broken down by work element — not a lump sum. This allows meaningful comparison with other contractors' estimates, which is what the tribunal expects if the consultation is ever challenged. Our specifications are detailed enough to serve as the benchmark against which other contractors price.

Stage 3 — Notification: Leaseholders are notified of the awarded contract and have a further 30 days to make observations. The landlord must have regard to these observations before confirming the contract.

Failure to follow the Section 20 process correctly limits the landlord's ability to recover costs through the service charge to £250 per leaseholder regardless of the actual cost. On a communal roof replacement costing £40,000 across 12 leaseholders, this means recovering £3,000 instead of £40,000 — a £37,000 shortfall. Getting the consultation right is not optional.

Reserve Fund Condition Surveys

A roof condition survey with a 5-year and 10-year cost forecast is one of the most valuable tools a managing agent or RTM director can commission. It provides: current condition assessment of every roof component (tiles, flashings, gutters, chimneys, flat roof sections), estimated remaining life for each component, a timeline of anticipated major works, and costed recommendations for planned maintenance that extends component life.

This information feeds directly into reserve fund calculations, allowing the managing agent to set service charge contributions at a level that accumulates adequate reserves before major works are needed. The alternative — an emergency levy when the roof fails — damages leaseholder relationships, creates disputes, and can trigger tribunal challenges to the service charge.

Our condition surveys cost £300–£600 for a typical managed block and include a written report with photographs, condition grading, cost forecasts, and maintenance recommendations. We present findings to AGMs or directors' meetings on request.

Flat Roofs on Managed Blocks

Many managed blocks in Godalming have flat roof sections — over communal stairwells, entrance canopies, rear extensions, and garages. These flat roofs are often the first components to fail because they have shorter design lives than pitched roofs and are more exposed to standing water. We install and maintain GRP fibreglass, EPDM rubber and single-ply membrane systems on communal flat roofs, with specifications designed for the access patterns and maintenance regimes that managed blocks require.

Working with Managing Agents

We understand the documentation and communication requirements that managing agents work with. We provide: formal specifications suitable for Section 20 consultation, fully itemised estimates with work element breakdowns, method statements and risk assessments before work starts, resident notification templates, progress updates during longer projects, completion certificates and guarantee documentation, and VAT invoices formatted for service charge accounting. Call 01483 346 855 to discuss your block's requirements.

Emergency Response for Managed Blocks

Communal roof leaks affect multiple households simultaneously and require faster response than individual property emergencies. We provide a priority response service for managing agents: 2-hour attendance during business hours for multi-unit water ingress affecting communal areas or multiple flats. Make-safe work is documented with timestamped photographs suitable for leaseholder communication and insurance claims. The emergency number is the same: 01483 346 855 — identify the property as a managed block for priority routing.

Insurance and Procurement

We provide the documentation that property managers need: detailed specifications suitable for insurance pre-approval on larger claims; formal estimates meeting Section 20 consultation requirements; RAMS (Risk Assessment and Method Statement) for every project; evidence of £5m public liability insurance and NFRC registration; and invoices on 30-day terms with PO referencing for managed block accounts. We understand that property management operates within procurement frameworks and compliance requirements that individual homeowners do not — our documentation and process are designed to meet these standards without additional administration on your part.

Why Managing Agents Choose Us

We understand the documentation, procurement and communication requirements that property management operates within. Our specifications are detailed enough for Section 20 consultation. Our estimates are itemised for meaningful contractor comparison. Our RAMS are prepared before work starts. Our invoices reference your PO numbers and are issued on 30-day terms. And our communication with residents is professional, courteous and coordinated through the managing agent or directors as you prefer.

We have maintained managed blocks across Godalming for over 15 years. We understand that managing agents answer to leaseholders, directors answer to members, and both answer to the tribunal if consultation is challenged. Our documentation is designed to withstand that scrutiny. Call 01483 346 855 to discuss your block requirements.

Leaseholder Communication

Roof work on managed blocks affects every resident. We provide managing agents and directors with: pre-work notification templates that can be customised with specific dates and durations; weekly progress updates during longer projects that can be forwarded to residents; completion notification confirming work is finished and scaffold will be struck; and a summary report suitable for circulation at the next AGM or residents meeting. Clear communication prevents complaints, builds confidence in the management, and supports the Section 20 process by demonstrating that leaseholders are kept informed throughout.

Common Block Roof Issues in Godalming

The converted Victorian and Edwardian properties in the town centre and Farncombe present specific challenges for block managers. These buildings were designed as single dwellings and later subdivided into flats. The roof remains a single structure covering multiple leasehold units, but the original design did not anticipate shared drainage paths, multiple flue requirements, and the access complications of multi-occupation. Valley gutters between original roof sections are the most common failure point — they carry drainage from multiple roof slopes and, when they fail, water enters at a point where it can affect several flats simultaneously.

Purpose-built flat developments — including newer blocks along the Woolsack Way area and in Ockford Park — have simpler roof structures but their own maintenance requirements. Flat roof sections over communal hallways and stairwells are exposed to ponding water and require regular inspection. Shared gutter systems serve the entire building and a single blockage can cause overflow damage to multiple units.

Reserve Fund Adequacy

A communal roof replacement on a 12-unit block in Godalming typically costs £25,000-£50,000 depending on size, material specification and access complexity. If the reserve fund has not been building toward this expenditure, each leaseholder faces a sudden levy of £2,000-£4,000. Our condition surveys identify the anticipated timeline for major works — allowing service charge contributions to be set at a level that accumulates adequate reserves over the remaining life of the current roof. This is responsible financial planning, and it is one of the strongest arguments for regular professional condition surveys on managed blocks. Call 01483 346 855.

Getting started

Book Your Free Survey

Every project starts with understanding your property. Our free survey takes 30–45 minutes, covers every accessible part of your roof, and results in a written report with photographs and clear recommendations. There is no obligation to proceed, no sales pressure, and no call-out charge. The survey fee — where applicable on specialist inspections — is credited in full against any work booked.

We typically attend within one week of your call and deliver the written report within 24 hours of the inspection. For emergencies, we attend within 1–2 hours. Call 01483 346 855 to book.

Get In Touch

Managing Agent or Freeholder?

Call to discuss your block's roofing requirements.

01483 346 855

Last updated: August 2026

📞 Call Now — Free Quote