How We Handle Storm Damage in the Wey Valley
Storm damage repair is different from planned roofing work. Speed matters, but accuracy matters more — a rushed make-safe that misses a secondary damage point leaves you exposed when the next rain arrives. Our storm damage process balances urgency with thoroughness, built from 20 years of attending Godalming emergencies.
Phase 1 — Make Safe (Hours 1-4)
On arrival, we assess the immediate risk: is the structure compromised? Is water actively entering the building? Are loose materials endangering people below? We address the highest-priority risk first. Typical make-safe actions: heavy-duty tarpaulin over exposed sections (UV-stabilised, weighted and secured — not a hardware-store tarp held with bricks), emergency boarding over structural openings, removal and safe stacking of displaced tiles and ridge sections, and temporary flashing over exposed chimney junctions. We photograph everything during the make-safe for your insurance claim.
Phase 2 — Assessment (Hours 4-24)
Once the property is weathertight, we conduct a thorough assessment. Storm damage is rarely confined to the visible impact point. Wind uplift that displaced tiles on the south-west face may have loosened fixings on the sheltered side. A fallen branch that damaged the ridge may have transmitted force through the timber structure to purlins below. We check the entire roof, inside the loft and from every external elevation, to map the full extent of damage — not just the obvious impact.
Phase 3 — Insurance Documentation (24-48 Hours)
Within 24 hours, you receive a professional report containing: timestamped photographs of all damage found (before and after make-safe), a cause assessment linking the damage to the specific weather event (date, wind speed, rainfall intensity — this is what insurers need), an itemised scope of permanent repair work with estimated costs, and a separate line for the make-safe costs already incurred. This report is formatted for direct submission to your insurer's claims team.
Phase 4 — Permanent Repair (Days 3-10)
We schedule permanent repairs as priority work, typically within 3-5 working days of the emergency. The repair specification matches our standard quality — same materials, same workmanship guarantee, same attention to detail. Emergency origin does not mean reduced quality. The permanent repair quote is separate from the make-safe costs, allowing your insurer to assess and approve each element independently. On complex claims, we liaise directly with loss adjusters and provide supplementary information as requested.
The Wey Valley Storm Pattern
Atlantic weather systems track from the south-west, hitting the Surrey Hills and funnelling through the Wey Valley. The hills either side of the valley compress and accelerate the airflow, creating localised wind speeds that exceed those on the exposed hilltops. Our storm data from 20 years of Godalming emergencies shows clear patterns: south-west elevations suffer 60% of tile displacement; ridge tiles on the windward side of the ridge fail first; properties within 20 metres of mature trees account for 35% of structural damage calls; and the valley floor experiences more intense rainfall per event than the surrounding hills due to orographic enhancement. These patterns inform our assessment — we know where to look first and what secondary damage each pattern typically causes.